Time Left : 00:00
A
2.7 × average daily demand
B
1.8 × average daily demand
C
1.5 × average hourly demand
D
1.48 × average hourly demand
A
29.935 m
B
261.90 m
C
299.356 m
D
26.190 m
A
Superplasticizers
B
Accelerators
C
Plasticizers
D
Fly ash
A
300 mm
B
30 m
C
15 m
D
150 mm
A
1720
B
1800
C
1497
D
1630
A
fourth
B
second
C
third
D
first
A
0.8 x105 N/mm2
B
0.7 x 105 N/mm2
C
1 x105 N/mm2
D
0.9 x 105 N/mm2
A
Optimistic time estimate
B
The most likely time estimate
C
Expected time estimate
D
Pessimistic time estimate
A
1.2
B
1.347
C
1.567
D
8.20
A
Flush joint
B
Collar joint
C
Bandage joint
D
Spigot joint
A
1955
B
1950
C
1947
D
1952
A
Difference in level of two rails
B
Vertical movement of rail
C
Longitudinal movement of rail
D
Lateral movement of rail
A
The quadrantal system from 0 to 90o in the four quadrants
B
The semi-circle system from 0 to 180o in the right and left halves
C
Similar to that of prismatic compass
D
The whole circle system from 0 to 360o
A
tenacity
B
plasticity
C
elasticity
D
ductility
A
Super passage
B
Syphon aqueduct
C
Syphon
D
Aqueduct
A
Pg = -4.44 cm
B
Pg = 78 km
C
Pg = 7.5 cm
D
Pg = -4.33 m
A
Parallel activities
B
Dummy activities
C
Predecessor and successor activities
D
Sequential activities
A
130
B
390
C
520
D
260
A
At critical depth
B
Which occurs at the same specific energy
C
At same velocity points
D
Which have the same specific energy
A
(i),(ii) and (iv)
B
(i),(iii) and (iv)
C
(i),(ii) and (iii)
D
(ii),(iii) and (iv)