Time Left : 00:00
A
Ultrasonic testing
B
Compression Testing
C
Eddy current testing
D
Visual testing
A
Geometric increase method
B
Arithmetic increase method
C
Decreasing growth rate method
D
Incremental increase method
A
27oC
B
23oC
C
25oC
D
21oC
A
May or may not depend
B
Does not depend
C
Larger size of aggregate higher will be workability
D
Larger size of aggregate lower will be workability
A
76.363 m
B
763.63 m
C
381.81 m
D
190.90 m
A
2.213 m3/hr
B
3.224 m3/hr
C
1.242 m3/hr
D
5 m3/hr
A
1.24 x 10-4cm/sec
B
1.52 x 10-3cm/sec
C
1.84 x 10-5cm/sec
D
1.10 x 10-2cm/sec
A
4% of effective area of beam
B
4% of gross area of beam
C
6% of gross area of beam
D
6% of effective area of beam
A
Descending parcel of heavier air cooler than the surrounding air
B
Warmer air lies over the colder air
C
Warmer air lies below the colder air
D
Rising parcel of air warmer than the surrounding environment
A
Bending stress
B
Eccentricity
C
Combined stress
D
Direct Stress
A
Analysis of process chart
B
Ordering schedule of job
C
Flow of Metals
D
Controlling the inventory costs money
A
1 in 600
B
1 in 25000
C
1 in 5000
D
1 in 10000
A
RL of BM -BS+IS
B
RL of BM-BS-IS
C
RL of BM+BS-IS
D
RL of BM+BS+IS
A
Beams, Girders, Arches
B
Piers, Abutments, Wingwalls
C
Approaches, Guard Stones, Bearings
D
Parapet Walls, Foundations, Hand Rails
A
parabolic, parabolic
B
rectangular, parabolic
C
rectangular, rectangular
D
parabolic, rectangular
A
IRC 75
B
IRC 78
C
IRC 22
D
IRC 21
A
Well graded hard crushed aggregates and adequate proportion of cutback mixed thoroughly in a mixing plant
B
Well graded hard crushed aggregates and adequate proportion of bitumen mixed thoroughly in a mixing plant
C
Well graded hard crushed aggregates and adequate proportion of water mixed thoroughly in a mixing plant
D
Well graded hard crushed aggregates and adequate proportion of emulsion mixed thoroughly in a mixing plant
A
Telephone expenses
B
Cash receipts
C
Cash payments
D
Depreciation
A
Estimating and costing activities
B
Investment activity
C
Operating activity
D
Financial activity
A
Intermediate Sight Distance
B
Passing Sight Distance
C
Head-light sight distance
D
Safe overtaking Sight distance