Civil Engineering MCQs

Construction Management Questions with solutions MCQs

1. Which one of the following is INCORRECT for the condition to be satisfied in any network of pipes of distribution system?

A

In each loop, the loss of head due to flow in clockwise direction must be equal to the loss of head due to flow in anticlockwise direction

B

According to the principle of continuity, the flow into each junction must be equal to the flow out of the junction

C

In this system of layout the mains, submains, and branches are interconnected with each other

D

Hazen Williams formula or Darcy?Weisbach formula must be satisfied for flow in each pipe of the network

Construction Management JE Civil 27 Oct 2021 (Shift 2)
Correct Answer : C
Explanation :

Option C is correct as per standard civil engineering principle.

Correct Answered :

Wrong Answered :